Description‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi

Description

‫المملكة العربية السعودية‬
‫وزارة التعليم‬
‫الجامعة السعودية اإللكترونية‬
Kingdom of Saudi Arabia
Ministry of Education
Saudi Electronic University
College of Administrative and Financial Sciences
Assignment 3
Project Management (MGT 323)
Due Date: 04/05/2024 @ 23:59
Course Name: Project Management
Student’s Name:
Course Code: MGT323
Student’s ID Number:
Semester: Second Semester
CRN:
Academic Year:2023-24
For Instructor’s Use only
Instructor’s Name:
Students’ Grade: /10
Level of Marks: High/Middle/Low
General Instructions – PLEASE READ THEM CAREFULLY








The Assignment must be submitted on Blackboard (WORD format only) via allocated
folder.
Assignments submitted through email will not be accepted.
Students are advised to make their work clear and well presented, marks may be reduced
for poor presentation. This includes filling your information on the cover page.
Students must mention question number clearly in their answer.
Late submission will NOT be accepted. Peer-Reviewed Journals are required as
references.
Avoid plagiarism, the work should be in your own words, copying from students or other
resources without proper referencing will result in ZERO marks. No exceptions.
All answered must be typed using Times New Roman (size 12, double-spaced) font. No
pictures containing text will be accepted and will be considered plagiarism).
Submissions without this cover page will NOT be accepted.
• Do not make any changes in the cover page.
Assignment Workload:
• This Assignment comprise of a Case Study and Discussion questions.
• Assignment is to be submitted by each student individually.
Assignment Purposes/Learning Outcomes:
After completion of Assignment-3 students will able to understand the
1. Defining the concepts, theories and approaches of project management. (L.O-1.1)
2. Analyze to work effectively and efficiently as a team member for project related
cases. (L.O-3.1)
3. Evaluate to monitor and control the project. (L.O-3.2)
Assignment-3: Case Study
Assignment Case study Question:
(Marks 10)
Please read the Case-8.3 “Tham Luang Cave Rescue.” from Chapter 8
“Scheduling Resources and Costs” given in your textbook – Project
Management: The Managerial Process 8th edition by Larson and Gray page
no: 304-307 also refer to specific concepts you have learned from the chapter
to support your answers. Answer the following questions.
Case study questions
1. How did the physical environment of the cave affect the rescue
plan? Explain in 250 words (3.5 Marks).
2. How did the rescue team respond to the risks of the project?
Explain in 250 words (3.5 Marks).
3. Some have called the rescue a miracle and that luck was the
decisive factor. Do you agree? Explain in 150 words (3 Marks)
Answers:

Purchase answer to see full
attachment

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

DescriptionIn Brazil, the export industry always finds ways to cut costs. The international community expressed its dismay at the manufacturers’

Description In Brazil, the export industry always finds ways to cut costs. The international community expressed its dismay at the manufacturers’ latest cost-cutting decision to replace flouride with diethylene glycol in toothpaste. Flouride is designed to strengthen teeth enamel. Diethylene glycol is a poisonous substance used to make chemicals that

Identifying and classifying resources is an important step toward understanding their inherent characteristics and the objectives for which they are used.

Identifying and classifying resources is an important step toward understanding their inherent characteristics and the objectives for which they are used. It is critical to completely understand the resource and those who use it. Once you have completed the content evaluation, assess the material’s typability features. The descriptions of the